IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0263 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,472 $1,660 Implemented
MI0263 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $1,375 $360 Implemented
MI0263 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $80 Implemented
MI0263 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $708 $280 Not Implemented
MI0263 # 13 Y:2014 13 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $409 $173 Implemented
DL0127 # 01 Y:2014 01 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,800 $100 Implemented
DL0127 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,800 $2,100 Not Implemented
DL0127 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $100 Not Implemented
DL0127 # 04 Y:2014 04 2014 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $1,200 $1,800 Not Implemented
DL0127 # 05 Y:2014 05 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,000 $50 Not Implemented
DL0127 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $28,400 $2,100 Not Implemented
DL0127 # 07 Y:2014 07 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $15,300 $5,700 Not Implemented
DL0127 # 08 Y:2014 08 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,900 $13,000 Not Implemented
DL0127 # 09 Y:2014 09 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,800 $250 Implemented
DL0127 # 10 Y:2014 10 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,900 $3,200 Not Implemented
DL0127 # 11 Y:2014 11 2014 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,900 $5,200 Not Implemented
DL0127 # 12 Y:2014 12 2014 INSTALL OCCUPANCY SENSORS $3,400 $2,300 Implemented
MI0257 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $68,259 $15,600 Implemented
MI0257 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $13,943 $3,100 Implemented
MI0257 # 03 Y:2014 03 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,113 $19,160 Not Implemented
MI0257 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,995 $13,902 Not Implemented
MI0257 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,335 $2,660 Implemented
MI0257 # 06 Y:2014 06 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,027 $80 Implemented
MI0257 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $4,923 $5,360 Implemented
MI0257 # 08 Y:2014 08 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,989 $440 Not Implemented