Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2014 |
Principal Product | Whipped cream and freezer pops |
NAICS | 311412 - Frozen Specialty Food Manufacturing |
SIC | 2038 - Frozen Specialties, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 35,200,000 Pieces |
Production Hrs. Annual | 7,800 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $192,003 | 4,932,900 | kWh | $0.04 |
Electricity Demand | $120,525 | 10,440 | kW-months/year | $11.54 |
Natural Gas | $147,356 | 28,014 | MMBtu | $5.26 |
TOTAL ENERGY COSTS | $459,884 | |||
RECOMMENDED SAVINGS* | $1,276,268 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,264,997 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $1,248,000 Cost: $800,000 |
- | - | - | - | - | - | $1,248,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,248,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,224 Cost: $50 |
$5,581 | 143,120 | $2,643 | 220 | - | - | - | - | - | - |
$5,581 143,120 kWh |
$2,643 220 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $824 Cost: $1,750 |
- | - | - | - | $824 | 157 | - | - | - | - |
- - kWh |
- - kW-months/year |
$824 157 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,276 Cost: $100 |
$1,640 | 42,042 | $776 | 65 | - | - | $(-900) | - | $(-240) | - |
$1,640 42,042 kWh |
$776 65 kW-months/year |
- - MMBtu |
$(-900) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $3,126 Cost: $5,000 |
$2,122 | 54,405 | $1,004 | 84 | - | - | - | - | - | - |
$2,122 54,405 kWh |
$1,004 84 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $7,321 Cost: $15,000 |
- | - | - | - | $7,321 | 1,392 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,321 1,392 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $524 Cost: $100 |
$255 | - | $269 | 25 | - | - | - | - | - | - |
$255 - kWh |
$269 25 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,258 Cost: $4,256 |
$1,532 | 39,288 | $726 | 60 | - | - | - | - | - | - |
$1,532 39,288 kWh |
$726 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,951 Cost: $7,604 |
$1,238 | 31,741 | $713 | 59 | - | - | - | - | - | - |
$1,238 31,741 kWh |
$713 59 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,688 Cost: $3,708 |
$1,158 | 29,702 | $549 | 45 | - | - | - | - | $(-19) | - |
$1,158 29,702 kWh |
$549 45 kW-months/year |
- - MMBtu |
- - $ |
$(-19) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $536 Cost: $160 |
$167 | 4,275 | $70 | 6 | - | - | - | - | $299 | - |
$167 4,275 kWh |
$70 6 kW-months/year |
- - MMBtu |
- - $ |
$299 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $103 Cost: $80 |
$103 | 2,640 | - | - | - | - | - | - | - | - |
$103 2,640 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $437 Cost: $774 |
$437 | 11,213 | - | - | - | - | - | - | - | - |
$437 11,213 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,276,268 Cost: $838,582 |
$14,233 | 358,426 | $6,750 | 564 | $8,145 | 1,549 | $1,247,100 | - | $40 | - | $14,233 358,426 kWh |
$6,750 564 kW-months/year |
$8,145 1,549 MMBtu |
$1,247,100 - $ |
$40 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,264,997 Cost: $816,832 |
$12,111 | 304,021 | $5,746 | 480 | - | - | $1,247,100 | - | $40 | - | $12,111 304,021 kWh |
$5,746 480 kW-months/year |
- - MMBtu |
$1,247,100 - $ |
$40 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |