IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0132 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,152 $12,430 Implemented
MZ0132 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $4,877 $2,600 Implemented
MZ0132 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,603 $3,100 Implemented
MZ0132 # 10 Y:2013 10 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,050 $925 Not Implemented
MZ0132 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,911 $1,030 Not Implemented
MZ0132 # 12 Y:2013 12 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,198 $0 Not Implemented
MZ0132 # 13 Y:2013 13 2013 INSTALL OCCUPANCY SENSORS $1,565 $640 Implemented
MZ0132 # 14 Y:2013 14 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $865 $635 Implemented
MZ0132 # 15 Y:2013 15 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $791 $1,000 Implemented
DL0107 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $136,640 $115,225 Not Implemented
DL0107 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $2,712 $1,626 Not Implemented
DL0107 # 03 Y:2013 03 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $21,280 $100 Not Implemented
DL0107 # 04 Y:2013 04 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,000 $100 Not Implemented
DL0107 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $17,100 $9,000 Not Implemented
DL0107 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $85,260 $300 Not Implemented
DL0107 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $35,439 $106,317 Not Implemented
DL0113 # 01 Y:2013 01 2013 RECOVER AND REUSE COOLING WATER $33,000 $135,000 Not Implemented
DL0113 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,884 $2,770 Implemented
DL0113 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $7,300 $4,043 Not Implemented
DL0113 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,800 $7,588 Implemented
DL0113 # 05 Y:2013 05 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $25,100 $9,800 Not Implemented
DL0113 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $8,270 $7,000 Not Implemented
DL0113 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,030 $18,354 Implemented
OR0610 # 01 Y:2013 01 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $11,054 $11,584 Not Implemented
OR0610 # 02 Y:2013 02 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $8,287 $11,998 Not Implemented