IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,571

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0413 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $380 Implemented
SF0413 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,032 $1,872 Not Implemented
SF0413 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $380 $2,139 Not Implemented
SF0413 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $256 $684 Not Implemented
SF0413 # 06 Y:2012 06 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $40,499 $409,247 Implemented
SF0408 # 01 Y:2012 01 2012 AIR CONDITION ONLY SPACE NECESSARY $4,725 $0 Not Implemented
SF0408 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $0 Implemented
SF0408 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,571 $80 Implemented
SF0408 # 04 Y:2012 04 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,344 $4,267 Not Implemented
SF0408 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,255 $11,297 Implemented
SF0408 # 06 Y:2012 06 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $231,136 $1,514,353 Implemented
SF0405 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,795 $1,200 Implemented
SF0405 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $76,949 $36,149 Implemented
SF0405 # 03 Y:2012 03 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $139,563 $85,532 Implemented
SF0405 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,933 $21,797 Not Implemented
SF0405 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $38,824 $39,132 Not Implemented
SF0405 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,152 $11,614 Not Implemented
SF0405 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,595 $93,960 Not Implemented
SF0405 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $3,761 $9,004 Implemented
SF0405 # 09 Y:2012 09 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $112,997 $524,700 Not Implemented
SF0405 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,215 $62,332 Implemented
SF0405 # 11 Y:2012 11 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,005 $6,397 Not Implemented
MI0211 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $25,532 $213,119 Implemented
MI0211 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,191 $41,400 Implemented
MI0211 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,390 $25,000 Not Implemented