Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,571
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0209 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,599 | $1,320 | Implemented |
MI0209 # 09 Y:2011 | 09 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,681 | $50 | Implemented |
MI0209 # 10 Y:2011 | 10 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,382 | $2,550 | Not Implemented |
MI0209 # 11 Y:2011 | 11 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,779 | $45,345 | Not Implemented |
MI0209 # 12 Y:2011 | 12 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,268 | $3,200 | Implemented |
MI0209 # 13 Y:2011 | 13 | 2011 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $7,944 | $2,000 | Not Implemented |
MI0209 # 14 Y:2011 | 14 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,235 | $3,450 | Implemented |
MI0209 # 15 Y:2011 | 15 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,926 | $3,450 | Implemented |
LE0315 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $404,827 | $2,200,000 | Not Implemented |
LE0315 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,359 | $25,500 | Not Implemented |
LE0315 # 03 Y:2011 | 03 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,842 | $2,500 | Not Implemented |
LE0315 # 04 Y:2011 | 04 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $22,464 | $250 | Implemented |
LE0315 # 05 Y:2011 | 05 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,864 | $50,000 | Implemented |
LE0315 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,689 | $40 | Not Implemented |
LE0315 # 07 Y:2011 | 07 | 2011 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,281 | $20,000 | Not Implemented |
LE0315 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,370 | $2,000 | Not Implemented |
LE0315 # 09 Y:2011 | 09 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,370 | $249 | Implemented |
SU0303 # 01 Y:2011 | 01 | 2011 | INSULATE FEEDWATER TANK | $273 | $83 | Implemented |
SU0303 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $858 | $486 | Implemented |
SU0303 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $128 | Implemented |
SU0303 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,814 | $10,990 | Not Implemented |
SU0303 # 05 Y:2011 | 05 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $103 | $275 | Not Implemented |
SU0303 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,973 | $9,016 | Not Implemented |
SU0303 # 07 Y:2011 | 07 | 2011 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,074 | $16,668 | Not Implemented |
LE0312 # 01 Y:2011 | 01 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $39,912 | $50,000 | Not Implemented |