Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,566
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0389 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $601 | $4,125 | Not Implemented |
SD0389 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $264 | $1,006 | Implemented |
OR0510 # 01 Y:2006 | 01 | 2006 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $61,000 | $40,000 | Implemented |
OR0510 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $15,000 | $11,600 | Not Implemented |
OR0510 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,200 | $35,000 | Implemented |
OR0510 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $11,250 | $13,600 | Not Implemented |
OR0510 # 05 Y:2006 | 05 | 2006 | INSTALL SKYLIGHTS | $4,750 | $12,400 | Not Implemented |
OR0510 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,480 | $5,000 | Not Implemented |
OR0510 # 07 Y:2006 | 07 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,900 | $19,200 | Implemented |
OR0508 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $69,500 | $30,000 | Implemented |
OR0508 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $53,000 | $2,000 | Implemented |
OR0508 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,700 | $5,000 | Implemented |
OR0508 # 04 Y:2006 | 04 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $375,000 | $480,000 | Not Implemented |
OR0508 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $18,300 | $31,500 | Not Implemented |
OR0508 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,200 | $3,200 | Implemented |
OR0508 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,100 | $12,000 | Implemented |
OR0508 # 08 Y:2006 | 08 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,100 | $30,000 | Implemented |
OR0508 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,700 | $6,900 | Not Implemented |
SF0333 # 01 Y:2006 | 01 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,964 | $9,840 | Not Implemented |
SF0333 # 02 Y:2006 | 02 | 2006 | USE COMPRESSOR AIR FILTERS | $3,806 | $1,200 | Not Implemented |
SF0333 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,592 | $4,815 | Not Implemented |
SF0333 # 04 Y:2006 | 04 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,439 | $600 | Not Implemented |
SF0333 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,301 | $4,440 | Not Implemented |
SF0333 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,924 | $17,809 | Not Implemented |
SF0333 # 07 Y:2006 | 07 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $22,820 | $20,775 | Not Implemented |