Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
350
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0405 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,595 | $93,960 | Not Implemented |
SF0405 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $3,761 | $9,004 | Implemented |
SF0405 # 09 Y:2012 | 09 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $112,997 | $524,700 | Not Implemented |
SF0405 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,215 | $62,332 | Implemented |
SF0405 # 11 Y:2012 | 11 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,005 | $6,397 | Not Implemented |
SF0399 # 01 Y:2011 | 01 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $14,389 | $0 | Implemented |
SF0399 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,958 | $20,025 | Not Implemented |
SF0399 # 03 Y:2011 | 03 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,432 | $962 | Implemented |
SF0399 # 04 Y:2011 | 04 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $347 | $393 | Implemented |
SF0399 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $42,675 | $101,238 | Not Implemented |
SF0399 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $835 | $2,209 | Not Implemented |
SF0399 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $1,028 | $4,855 | Not Implemented |
SF0399 # 08 Y:2011 | 08 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $31,982 | $112,500 | Not Implemented |
SF0399 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,758 | $307,524 | Implemented |
SF0399 # 10 Y:2011 | 10 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,800 | $37,014 | Not Implemented |
SF0399 # 11 Y:2011 | 11 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,286 | $77,335 | Not Implemented |
SF0399 # 12 Y:2011 | 12 | 2011 | INSTALL OCCUPANCY SENSORS | $5,862 | $26,604 | Implemented |
SF0399 # 13 Y:2011 | 13 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,038 | $65,479 | Not Implemented |
SF0399 # 14 Y:2011 | 14 | 2011 | ADOPT IN-HOUSE MATERIAL GENERATION | $38,710 | $49,256 | Not Implemented |
SF0384 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $65,311 | $0 | Implemented |
SF0384 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $806 | $0 | Implemented |
SF0384 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $450 | $0 | Implemented |
SF0384 # 04 Y:2010 | 04 | 2010 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $70,630 | $14,698 | Implemented |
SF0384 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $94 | $48 | Implemented |
SF0384 # 06 Y:2010 | 06 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,925 | $4,309 | Implemented |