IAC logo
IAC Assessment: SF0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2010
Principal Product Food Products- Canned Beans & Hominy
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 3,600,000 Units
Production Hrs. Annual 5,150
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,589 2,717,938 kWh $0.08
Electricity Demand $101,012 8,428 kW-months/year $11.99
Electricity Fees $22,610 - $ -
Natural Gas $617,067 125,850 MMBtu $4.90
TOTAL ENERGY COSTS $966,278
RECOMMENDED SAVINGS* $173,716 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $164,443
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$65,311
Cost:
-
- - - - $65,311 13,780 - - -
-
kWh
-
-
kW-months/year
$65,311
13,780
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$806
Cost:
-
$1,166 11,133 - - - - $(-360) - $1,166
11,133
kWh
-
-
kW-months/year
-
-
MMBtu
$(-360)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$450
Cost:
-
$277 3,331 $173 14 - - - - $277
3,331
kWh
$173
14
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$70,630
Cost:
$14,698
- - - - $70,630 14,414 - - -
-
kWh
-
-
kW-months/year
$70,630
14,414
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$94
Cost:
$48
$53 636 $41 3 - - - - $53
636
kWh
$41
3
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,925
Cost:
$4,309
$4,490 53,941 $2,435 204 - - - - $4,490
53,941
kWh
$2,435
204
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,056
Cost:
$11,016
- - - - $8,056 1,644 - - -
-
kWh
-
-
kW-months/year
$8,056
1,644
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,074
Cost:
$8,348
$2,692 32,343 $1,382 120 - - - - $2,692
32,343
kWh
$1,382
120
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,199
Cost:
$14,850
$2,840 34,121 $2,359 204 - - - - $2,840
34,121
kWh
$2,359
204
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,171
Cost:
$37,229
$7,615 91,482 $4,556 384 - - - - $7,615
91,482
kWh
$4,556
384
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$173,716
Cost:
$90,498
$19,133 226,987 $10,946 929 $143,997 29,838 $(-360) - $19,133
226,987
kWh
$10,946
929
kW-months/year
$143,997
29,838
MMBtu
$(-360)
-
$
TOTAL IMPLEMENTED Savings:
$164,443
Cost:
$67,300
$13,601 160,523 $7,205 605 $143,997 29,838 $(-360) - $13,601
160,523
kWh
$7,205
605
kW-months/year
$143,997
29,838
MMBtu
$(-360)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes