IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0198 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $1,600 Implemented
TT0198 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,495 $3,050 Not Implemented
TT0198 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,564 $34,509 Not Implemented
TT0198 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,752 $3,175 Implemented
TT0198 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $9,284 $50 Implemented
TT0160 # 02 Y:2015 02 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,461 $298 Implemented
TT0160 # 09 Y:2015 09 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $1,335 $2,000 Not Implemented
TT0160 # 08 Y:2015 08 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,322 $0 Not Implemented
TT0160 # 10 Y:2015 10 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $527 $1,176 Not Implemented
TT0160 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,882 $0 Not Implemented
TT0160 # 04 Y:2015 04 2015 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $10,534 $21,195 Implemented
TT0160 # 03 Y:2015 03 2015 REPAIR AND ELIMINATE STEAM LEAKS $13,910 $100 Not Implemented
TT0160 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $112,350 $2,000 Not Implemented
TT0160 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,397 $10,000 Not Implemented
TT0160 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $8,554 $14,129 Not Implemented
TT0044 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,476 $4,900 Implemented
TT0044 # 10 Y:2009 10 2009 DEVELOP A REPAIR/REPLACE POLICY $373 $976 Not Implemented
TT0044 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,198 $0 Not Implemented
TT0044 # 07 Y:2009 07 2009 USE COMPRESSOR AIR FILTERS $323 $75 Implemented
TT0044 # 06 Y:2009 06 2009 REPAIR OR REPLACE STEAM TRAPS $1,748 $4,000 Implemented
TT0044 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,904 $30,870 Implemented
TT0044 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,180 $2,000 Implemented
TT0044 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $7,850 $6,000 Implemented
TT0044 # 02 Y:2009 02 2009 REDUCE VENTILATION AIR $3,415 $0 Implemented
TT0044 # 01 Y:2009 01 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,027 $5,400 Not Implemented