Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0130 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $395 $1,259 Not Implemented
BS0130 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $141 $38 Not Implemented
BS0130 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $131 $180 Not Implemented
BS0130 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,199 $1,230 Not Implemented
BS0130 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,547 $14,646 Not Implemented
BS0130 # 06 Y:2019 06 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $28,587 $13,000 Not Implemented
BS0118 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $616 $960 Not Implemented
BS0118 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $257 $30 Not Implemented
BS0118 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,313 $760 Not Implemented
BS0118 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $275 Not Implemented
BS0118 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $210 Not Implemented
BS0118 # 07 Y:2019 07 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,186 $790 Not Implemented
BS0118 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,275 $20 Not Implemented
BS0079 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,545 $6,216 Not Implemented
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented
BS0073 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,966 $15,800 Not Implemented
BS0073 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,312 Not Implemented
BS0073 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $960 Not Implemented
BS0073 # 03 Y:2016 03 2016 USE OPTIMUM TEMPERATURE $419 $116 Not Implemented
BS0073 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $47 Not Implemented
BS0073 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,122 $220 Not Implemented
BS0073 # 06 Y:2016 06 2016 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $582 $316 Not Implemented
OR0584 # 02 Y:2012 02 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $26,558 $19,925 Not Implemented
OR0584 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,320 $0 Not Implemented