Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0287 # 10 Y:2015 | 10 | 2015 | USE PHOTOCELL CONTROLS | $184 | $600 | Implemented |
MI0287 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $397 | $709 | Implemented |
MI0287 # 08 Y:2015 | 08 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $907 | $336 | Not Implemented |
MI0287 # 07 Y:2015 | 07 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,047 | $280 | Not Implemented |
MI0287 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,450 | $3,140 | Implemented |
MI0287 # 05 Y:2015 | 05 | 2015 | USE OPTIMUM THICKNESS INSULATION | $2,395 | $8,535 | Not Implemented |
MI0287 # 04 Y:2015 | 04 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,439 | $160 | Not Implemented |
MI0287 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,014 | $4,218 | Implemented |
MI0287 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,717 | $1,400 | Not Implemented |
MI0287 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,892 | $10,800 | Implemented |
OR0653 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $611 | $1,058 | Not Implemented |
OR0653 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,625 | $1,000 | Not Implemented |
OR0653 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM THICKNESS INSULATION | $3,897 | $4,580 | Not Implemented |
OR0653 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,262 | $15,398 | Not Implemented |
OR0653 # 01 Y:2015 | 01 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $118,419 | $40,792 | Not Implemented |
OR0653 # 02 Y:2015 | 02 | 2015 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $36,536 | $30,728 | Not Implemented |
TT0160 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $112,350 | $2,000 | Not Implemented |
TT0160 # 02 Y:2015 | 02 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,461 | $298 | Implemented |
TT0160 # 03 Y:2015 | 03 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $13,910 | $100 | Not Implemented |
TT0160 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,397 | $10,000 | Not Implemented |
TT0160 # 04 Y:2015 | 04 | 2015 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $10,534 | $21,195 | Implemented |
TT0160 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,882 | $0 | Not Implemented |
TT0160 # 06 Y:2015 | 06 | 2015 | INSTALL OCCUPANCY SENSORS | $8,554 | $14,129 | Not Implemented |
TT0160 # 09 Y:2015 | 09 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,335 | $2,000 | Not Implemented |
TT0160 # 08 Y:2015 | 08 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,322 | $0 | Not Implemented |