Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0079 # 01 Y:2016 | 01 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,545 | $6,216 | Not Implemented |
BS0079 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $154 | $148 | Implemented |
BS0079 # 03 Y:2016 | 03 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $232 | $850 | Not Implemented |
SF0486 # 04 Y:2016 | 04 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $60,071 | $20,763 | Implemented |
SF0486 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $15,444 | $46,053 | Implemented |
SF0486 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,334 | $11,830 | Implemented |
SF0486 # 03 Y:2016 | 03 | 2016 | INSTALL STEAM TRAP | $59,001 | $20,027 | Not Implemented |
SF0486 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $1,616 | $1,456 | Not Implemented |
SF0486 # 06 Y:2016 | 06 | 2016 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $21,035 | $22,499 | Not Implemented |
SF0486 # 01 Y:2016 | 01 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $833 | $0 | Implemented |
SF0486 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,280 | $0 | Implemented |
SF0481 # 03 Y:2016 | 03 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,033 | $0 | Implemented |
SF0481 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,662 | $0 | Implemented |
SF0481 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,477 | $140 | Implemented |
SF0481 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,008 | $0 | Not Implemented |
SF0481 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $23,373 | $0 | Not Implemented |
SF0481 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $908 | $105 | Implemented |
SF0481 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,030 | $208 | Not Implemented |
SF0481 # 08 Y:2016 | 08 | 2016 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $119,304 | $36,151 | Not Implemented |
SF0481 # 09 Y:2016 | 09 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $48,481 | $18,682 | Implemented |
SF0481 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $660 | $769 | Implemented |
SF0481 # 11 Y:2016 | 11 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,601 | $10,000 | Not Implemented |
SF0481 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,674 | $10,567 | Not Implemented |
SF0481 # 13 Y:2016 | 13 | 2016 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,905 | $11,333 | Not Implemented |
MZ0215 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Not Implemented |