Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0142 # 05 Y:2020 | 05 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $888 | $1,944 | Not Implemented |
BS0142 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $53 | $75 | Not Implemented |
BS0142 # 03 Y:2020 | 03 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,266 | $1,811 | Not Implemented |
BS0142 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,550 | $6,370 | Not Implemented |
BS0142 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,675 | $335 | Not Implemented |
SF0554 # 02 Y:2020 | 02 | 2020 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $21,879 | $20,311 | Not Implemented |
SF0554 # 10 Y:2020 | 10 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,351 | $5,888 | Implemented |
SF0554 # 09 Y:2020 | 09 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $632 | $1,312 | Implemented |
SF0554 # 07 Y:2020 | 07 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $871 | $1,184 | Implemented |
SF0554 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $1,140 | $1,577 | Not Implemented |
SF0554 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,099 | $13,511 | Implemented |
SF0554 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,802 | $5,638 | Not Implemented |
SF0554 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $386 | $404 | Not Implemented |
SF0554 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $80 | Implemented |
SF0554 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $833 | $1,245 | Not Implemented |
SF0549 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,204 | $25,635 | Implemented |
SF0549 # 09 Y:2020 | 09 | 2020 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $44,084 | $48,094 | Not Implemented |
SF0549 # 08 Y:2020 | 08 | 2020 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $22,925 | $1,810 | Implemented |
SF0549 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,154 | $343,660 | Not Implemented |
SF0549 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $403 | $1,776 | Implemented |
SF0549 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,119 | $19,959 | Not Implemented |
SF0549 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $1,214 | Implemented |
SF0549 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,182 | $120 | Not Implemented |
SF0549 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,719 | $0 | Implemented |
UD1010 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,598 | $500 | Implemented |