IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

280

matching recommendations
Reset
NAICS 31141 Frozen Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0055 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,616 $121,800 Implemented
NL0055 # 05 Y:2021 05 2021 IMPROVE HANDLING PRACTICES $3,600 $1,600 Implemented
NL0055 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,975 $4,500 Implemented
NL0055 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $252 $1,000 Implemented
NL0055 # 04 Y:2021 04 2021 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $3,858 $146 Implemented
MI0386 # 04 Y:2021 04 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,129 $15,000 Implemented
MI0386 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,620 $43,782 Implemented
MI0386 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,559 $1,827 Implemented
SF0554 # 09 Y:2020 09 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $632 $1,312 Implemented
SF0554 # 10 Y:2020 10 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,351 $5,888 Implemented
SF0554 # 07 Y:2020 07 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $871 $1,184 Implemented
SF0554 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $80 Implemented
SF0554 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,099 $13,511 Implemented
UF0539 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $38,262 $166,880 Implemented
UF0539 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,002 $3,662 Implemented
UF0539 # 02 Y:2019 02 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $6,161 $518 Implemented
UF0539 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,250 $11,853 Implemented
MI0360 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $5,613 $13,630 Implemented
MI0360 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $9,735 $3,600 Implemented
MI0360 # 01 Y:2019 01 2019 USE SOLAR HEAT TO HEAT WATER $36,147 $40,234 Implemented
MI0360 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,445 $1,980 Implemented
MI0360 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $751 $211 Implemented
MI0360 # 08 Y:2019 08 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,675 $3,764 Implemented
MI0360 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $3,023 Implemented
MI0360 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,707 $3,634 Implemented