Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsNAICS | 31141 | Frozen Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0554 # 07 Y:2020 | 07 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $871 | $1,184 | Implemented |
SF0554 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,099 | $13,511 | Implemented |
SF0554 # 09 Y:2020 | 09 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $632 | $1,312 | Implemented |
SF0554 # 10 Y:2020 | 10 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,351 | $5,888 | Implemented |
UF0539 # 02 Y:2019 | 02 | 2019 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $6,161 | $518 | Implemented |
UF0539 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,262 | $166,880 | Implemented |
UF0539 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,250 | $11,853 | Implemented |
UF0539 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,002 | $3,662 | Implemented |
MI0360 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,445 | $1,980 | Implemented |
MI0360 # 11 Y:2019 | 11 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $476 | $868 | Implemented |
MI0360 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,707 | $3,634 | Implemented |
MI0360 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,735 | $3,600 | Implemented |
MI0360 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO HEAT WATER | $36,147 | $40,234 | Implemented |
MI0360 # 08 Y:2019 | 08 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,675 | $3,764 | Implemented |
MI0360 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,330 | $3,023 | Implemented |
MI0360 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $751 | $211 | Implemented |
MI0360 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $5,613 | $13,630 | Implemented |
MI0356 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,928 | $8,500 | Implemented |
MI0356 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,750 | $42,002 | Implemented |
MI0356 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,615 | $19,558 | Implemented |
MI0356 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,814 | $480 | Implemented |
MI0356 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,569 | $2,020 | Implemented |
SU0471 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,460 | $2,625 | Implemented |
SU0471 # 06 Y:2018 | 06 | 2018 | INSULATE FEEDWATER TANK | $75 | $172 | Implemented |
SU0471 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $703 | $1,240 | Implemented |