Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
678
matching recommendationsNAICS | 31141 | Frozen Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0429 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,606 | $7,343 | Implemented |
WV0429 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,932 | $3,252 | Implemented |
WV0429 # 06 Y:2011 | 06 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,791 | $547 | Implemented |
WV0429 # 05 Y:2011 | 05 | 2011 | USE AUTOMATIC CLEANING EQUIPMENT | $8,708 | $53,000 | Not Implemented |
WV0429 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,566 | $38,070 | Not Implemented |
WV0429 # 03 Y:2011 | 03 | 2011 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,356 | $22,155 | Not Implemented |
WV0429 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,142 | $20,962 | Not Implemented |
SF0399 # 01 Y:2011 | 01 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $14,389 | $0 | Implemented |
SF0399 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,958 | $20,025 | Not Implemented |
SF0399 # 03 Y:2011 | 03 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,432 | $962 | Implemented |
SF0399 # 04 Y:2011 | 04 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $347 | $393 | Implemented |
SF0399 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $42,675 | $101,238 | Not Implemented |
SF0399 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $835 | $2,209 | Not Implemented |
SF0399 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $1,028 | $4,855 | Not Implemented |
SF0399 # 08 Y:2011 | 08 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $31,982 | $112,500 | Not Implemented |
SF0399 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,758 | $307,524 | Implemented |
SF0399 # 10 Y:2011 | 10 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,800 | $37,014 | Not Implemented |
SF0399 # 11 Y:2011 | 11 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,286 | $77,335 | Not Implemented |
SF0399 # 12 Y:2011 | 12 | 2011 | INSTALL OCCUPANCY SENSORS | $5,862 | $26,604 | Implemented |
SF0399 # 13 Y:2011 | 13 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,038 | $65,479 | Not Implemented |
SF0399 # 14 Y:2011 | 14 | 2011 | ADOPT IN-HOUSE MATERIAL GENERATION | $38,710 | $49,256 | Not Implemented |
LE0315 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $404,827 | $2,200,000 | Not Implemented |
LE0315 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,359 | $25,500 | Not Implemented |
LE0315 # 03 Y:2011 | 03 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,842 | $2,500 | Not Implemented |
LE0315 # 04 Y:2011 | 04 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $22,464 | $250 | Implemented |