IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 31141 Frozen Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0513 # 03 Y:2018 03 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $66,148 $67,793 Implemented
SF0399 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,028 $4,855 Not Implemented
SF0399 # 13 Y:2011 13 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,038 $65,479 Not Implemented
SF0399 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,432 $962 Implemented
SF0399 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $14,389 $0 Implemented
SF0399 # 10 Y:2011 10 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,800 $37,014 Not Implemented
SF0399 # 08 Y:2011 08 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,982 $112,500 Not Implemented
SF0399 # 04 Y:2011 04 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $347 $393 Implemented
SF0399 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,958 $20,025 Not Implemented
SF0399 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,758 $307,524 Implemented
SF0399 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $42,675 $101,238 Not Implemented
SF0399 # 11 Y:2011 11 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,286 $77,335 Not Implemented
SF0399 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $5,862 $26,604 Implemented
SF0399 # 14 Y:2011 14 2011 ADOPT IN-HOUSE MATERIAL GENERATION $38,710 $49,256 Not Implemented
SF0399 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $835 $2,209 Not Implemented
SF0374 # 15 Y:2009 15 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,809 $31,988 Not Implemented
SF0374 # 14 Y:2009 14 2009 INSTALL OCCUPANCY SENSORS $701 $1,567 Implemented
SF0374 # 13 Y:2009 13 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,217 $4,719 Implemented
SF0374 # 12 Y:2009 12 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,489 $4,385 Implemented
SF0374 # 11 Y:2009 11 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,553 $5,659 Implemented
SF0374 # 10 Y:2009 10 2009 USE PHOTOCELL CONTROLS $18,403 $18,196 Implemented
SF0374 # 09 Y:2009 09 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $51,835 $40,007 Implemented
SF0374 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,237 $33,968 Implemented
SF0374 # 07 Y:2009 07 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,939 $12,500 Implemented
SF0374 # 06 Y:2009 06 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $15,888 $9,574 Implemented