IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

444

matching recommendations
Reset
NAICS 311411 Frozen Fruit, Juice, and Vegetable Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0399 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $14,389 $0 Implemented
SF0399 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,958 $20,025 Not Implemented
SF0399 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,432 $962 Implemented
SF0399 # 04 Y:2011 04 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $347 $393 Implemented
SF0399 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $42,675 $101,238 Not Implemented
SF0399 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $835 $2,209 Not Implemented
SF0399 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,028 $4,855 Not Implemented
SF0399 # 08 Y:2011 08 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,982 $112,500 Not Implemented
SF0399 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,758 $307,524 Implemented
SF0399 # 10 Y:2011 10 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,800 $37,014 Not Implemented
SF0399 # 11 Y:2011 11 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,286 $77,335 Not Implemented
SF0399 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $5,862 $26,604 Implemented
SF0399 # 13 Y:2011 13 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,038 $65,479 Not Implemented
SF0399 # 14 Y:2011 14 2011 ADOPT IN-HOUSE MATERIAL GENERATION $38,710 $49,256 Not Implemented
LE0315 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $404,827 $2,200,000 Not Implemented
LE0315 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,359 $25,500 Not Implemented
LE0315 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,842 $2,500 Not Implemented
LE0315 # 04 Y:2011 04 2011 INSTALL TIMERS AND/OR THERMOSTATS $22,464 $250 Implemented
LE0315 # 05 Y:2011 05 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,864 $50,000 Implemented
LE0315 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,689 $40 Not Implemented
LE0315 # 07 Y:2011 07 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,281 $20,000 Not Implemented
LE0315 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,370 $2,000 Not Implemented
LE0315 # 09 Y:2011 09 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,370 $249 Implemented
OR0565 # 01 Y:2011 01 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,900 $9,340 Implemented
OR0565 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $6,110 $21,715 Implemented