Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0513 # 02 Y:2017 | 02 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $25,893 | $3,150 | Implemented |
UF0513 # 04 Y:2017 | 04 | 2017 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $7,542 | $0 | Implemented |
UF0513 # 05 Y:2017 | 05 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,342 | $27,695 | Implemented |
UF0513 # 07 Y:2017 | 07 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,443 | $1,481 | Implemented |
UF0513 # 08 Y:2017 | 08 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,095 | $5,053 | Implemented |
UF0513 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,487 | $23,157 | Implemented |
MI0287 # 10 Y:2015 | 10 | 2015 | USE PHOTOCELL CONTROLS | $184 | $600 | Implemented |
MI0287 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $397 | $709 | Implemented |
MI0287 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,450 | $3,140 | Implemented |
MI0287 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,014 | $4,218 | Implemented |
MI0287 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,892 | $10,800 | Implemented |
MI0227 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,306 | $12,160 | Implemented |
MI0227 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,932 | $19,454 | Implemented |
MI0227 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,918 | $1,660 | Implemented |
MI0227 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $63,004 | $11,425 | Implemented |
MI0227 # 05 Y:2012 | 05 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,886 | $142,619 | Implemented |
MI0209 # 12 Y:2011 | 12 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,268 | $3,200 | Implemented |
MI0209 # 14 Y:2011 | 14 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,235 | $3,450 | Implemented |
MI0209 # 15 Y:2011 | 15 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,926 | $3,450 | Implemented |
MI0209 # 09 Y:2011 | 09 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,681 | $50 | Implemented |
MI0209 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,599 | $1,320 | Implemented |
MI0209 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,204 | $29,679 | Implemented |
MI0209 # 06 Y:2011 | 06 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $107,940 | $330,568 | Implemented |
MI0209 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $112,996 | $1,950 | Implemented |
MI0209 # 04 Y:2011 | 04 | 2011 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $132,137 | $500,000 | Implemented |