IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 31142 Fruit and Vegetable Canning, Pickling, and Drying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented
BS0079 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,545 $6,216 Not Implemented
OR0584 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,152 $251,677 Not Implemented
OR0584 # 06 Y:2012 06 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,796 $19,701 Not Implemented
OR0584 # 05 Y:2012 05 2012 MINIMIZE WATER USAGE $4,574 $7,000 Not Implemented
OR0584 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,631 $27,000 Not Implemented
OR0584 # 03 Y:2012 03 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,839 $29,000 Not Implemented
OR0584 # 02 Y:2012 02 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $26,558 $19,925 Not Implemented
OR0584 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,320 $0 Not Implemented
OR0543 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,510 $0 Implemented
OR0543 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Implemented
OR0543 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,500 $43,600 Implemented
OR0543 # 11 Y:2008 11 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $52,540 $2,200 Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
OR0543 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $413 Implemented
OR0543 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,017 $28,000 Not Implemented
OR0543 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $61,542 $40,950 Implemented
OR0543 # 09 Y:2008 09 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $78,900 $132,800 Implemented
OR0543 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $10,290 $54,000 Implemented
OR0543 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,310 $148,560 Implemented
OR0543 # 01 Y:2008 01 2008 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $244,531 $29,019 Not Implemented
OR0543 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $19,521 $31,119 Implemented
OR0510 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $11,250 $13,600 Not Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented