Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0079 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $154 | $148 | Implemented |
BS0079 # 03 Y:2016 | 03 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $232 | $850 | Not Implemented |
BS0079 # 01 Y:2016 | 01 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,545 | $6,216 | Not Implemented |
OR0584 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,152 | $251,677 | Not Implemented |
OR0584 # 06 Y:2012 | 06 | 2012 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $7,796 | $19,701 | Not Implemented |
OR0584 # 05 Y:2012 | 05 | 2012 | MINIMIZE WATER USAGE | $4,574 | $7,000 | Not Implemented |
OR0584 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,631 | $27,000 | Not Implemented |
OR0584 # 03 Y:2012 | 03 | 2012 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $16,839 | $29,000 | Not Implemented |
OR0584 # 02 Y:2012 | 02 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $26,558 | $19,925 | Not Implemented |
OR0584 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,320 | $0 | Not Implemented |
OR0543 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,510 | $0 | Implemented |
OR0543 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $46,700 | $46,700 | Implemented |
OR0543 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,500 | $43,600 | Implemented |
OR0543 # 11 Y:2008 | 11 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $52,540 | $2,200 | Implemented |
OR0543 # 13 Y:2008 | 13 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,300 | $5,700 | Implemented |
OR0543 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $413 | Implemented |
OR0543 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,017 | $28,000 | Not Implemented |
OR0543 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,542 | $40,950 | Implemented |
OR0543 # 09 Y:2008 | 09 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $78,900 | $132,800 | Implemented |
OR0543 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $10,290 | $54,000 | Implemented |
OR0543 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,310 | $148,560 | Implemented |
OR0543 # 01 Y:2008 | 01 | 2008 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $244,531 | $29,019 | Not Implemented |
OR0543 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $19,521 | $31,119 | Implemented |
OR0510 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $11,250 | $13,600 | Not Implemented |
OR0510 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,200 | $35,000 | Implemented |