Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
920
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0347 # 02 Y:2013 | 02 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $387 | $144 | Not Implemented |
SU0347 # 03 Y:2013 | 03 | 2013 | ELIMINATE/REDUCE AN OPERATION | $10,027 | $5,789 | Not Implemented |
SU0347 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $935 | Not Implemented |
SU0347 # 05 Y:2013 | 05 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $185 | $570 | Not Implemented |
LE0357 # 01 Y:2013 | 01 | 2013 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $990,391 | $2,480,000 | Not Implemented |
LE0357 # 02 Y:2013 | 02 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $41,310 | $87,100 | Implemented |
LE0357 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $992 | $225 | Implemented |
LE0357 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $143,805 | $5,420 | Not Implemented |
LE0357 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,839 | $0 | Implemented |
LE0357 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,062 | $3,910 | Implemented |
LE0357 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,733 | $11,400 | Not Implemented |
LE0357 # 08 Y:2013 | 08 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $1,285 | $4,500 | Implemented |
LE0357 # 09 Y:2013 | 09 | 2013 | OPTIMIZE PLANT POWER FACTOR | $20,522 | $42,000 | Implemented |
LE0357 # 10 Y:2013 | 10 | 2013 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $38 | $110 | Implemented |
SF0424 # 01 Y:2013 | 01 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $6,789 | $0 | Implemented |
SF0424 # 02 Y:2013 | 02 | 2013 | REDUCE FLUID FLOW RATES | $17,815 | $0 | Not Implemented |
SF0424 # 03 Y:2013 | 03 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $10,307 | $0 | Implemented |
SF0424 # 04 Y:2013 | 04 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,404 | $1,224 | Not Implemented |
SF0424 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $7,962 | $46,705 | Implemented |
SF0424 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,537 | $3,594 | Not Implemented |
SF0424 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79,423 | $291,716 | Implemented |
SF0424 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,020 | $4,007 | Not Implemented |
SF0424 # 09 Y:2013 | 09 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,508 | $26,000 | Not Implemented |
MAS032 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $8,920 | $8,000 | Not Implemented |
MAS032 # 02 Y:2012 | 02 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,141 | $8,000 | Not Implemented |