IAC logo
IAC Assessment: SF0424
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0424
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product dehydrated onion products
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 1,500,000
Annual Production 30 Units
Production Hrs. Annual 3,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $475,934 6,774,228 kWh $0.07
Electricity Demand $268,632 18,157 kW-months/year $14.79
Natural Gas $1,572,011 312,816 MMBtu $5.03
TOTAL ENERGY COSTS $2,316,577
RECOMMENDED SAVINGS* $135,765 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $104,481
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,789
Cost:
-
$3,808 54,170 - - - - $2,981 593 - - $3,808
54,170
kWh
-
-
kW-months/year
-
-
$
$2,981
593
MMBtu
-
-
$
02: 2.5123 REDUCE FLUID FLOW RATES Savings:
$17,815
Cost:
-
$12,965 184,421 $4,850 328 - - - - - - $12,965
184,421
kWh
$4,850
328
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$10,307
Cost:
-
- - - - - - $10,307 2,051 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,307
2,051
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,404
Cost:
$1,224
$2,404 34,200 - - - - - - - - $2,404
34,200
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,537
Cost:
$3,594
$2,667 37,491 $870 59 - - - - - - $2,667
37,491
kWh
$870
59
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,962
Cost:
$46,705
$6,090 86,635 $1,872 126 - - - - - - $6,090
86,635
kWh
$1,872
126
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$79,423
Cost:
$291,716
$60,269 857,308 $17,966 1,214 - - - - $1,188 - $60,269
857,308
kWh
$17,966
1,214
kW-months/year
-
-
$
-
-
MMBtu
$1,188
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,020
Cost:
$4,007
$1,020 14,514 - - - - - - - - $1,020
14,514
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,508
Cost:
$26,000
- - - - $6,508 - - - - - -
-
kWh
-
-
kW-months/year
$6,508
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$135,765
Cost:
$373,246
$89,223 1,268,739 $25,558 1,727 $6,508 - $13,288 2,645 $1,188 - $89,223
1,268,739
kWh
$25,558
1,727
kW-months/year
$6,508
-
$
$13,288
2,645
MMBtu
$1,188
-
$
TOTAL IMPLEMENTED Savings:
$104,481
Cost:
$338,421
$70,167 998,113 $19,838 1,340 - - $13,288 2,645 $1,188 - $70,167
998,113
kWh
$19,838
1,340
kW-months/year
-
-
$
$13,288
2,645
MMBtu
$1,188
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost