IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 31142 Fruit and Vegetable Canning, Pickling, and Drying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0513 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $25,893 $3,150 Implemented
UF0513 # 04 Y:2017 04 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $7,542 $0 Implemented
UF0513 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,342 $27,695 Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
UF0513 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,487 $23,157 Implemented
MI0287 # 10 Y:2015 10 2015 USE PHOTOCELL CONTROLS $184 $600 Implemented
MI0287 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $397 $709 Implemented
MI0287 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,450 $3,140 Implemented
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented
MI0287 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,892 $10,800 Implemented
MI0227 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,306 $12,160 Implemented
MI0227 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,932 $19,454 Implemented
MI0227 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,918 $1,660 Implemented
MI0227 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $63,004 $11,425 Implemented
MI0227 # 05 Y:2012 05 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,886 $142,619 Implemented
MI0209 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $13,268 $3,200 Implemented
MI0209 # 14 Y:2011 14 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,235 $3,450 Implemented
MI0209 # 15 Y:2011 15 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,926 $3,450 Implemented
MI0209 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,681 $50 Implemented
MI0209 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,599 $1,320 Implemented
MI0209 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,204 $29,679 Implemented
MI0209 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $107,940 $330,568 Implemented
MI0209 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $112,996 $1,950 Implemented
MI0209 # 04 Y:2011 04 2011 REPLACE TREATED WATER WITH WELL / SURFACE WATER $132,137 $500,000 Implemented