Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1010 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $299 | $0 | Implemented |
UD1010 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,598 | $500 | Implemented |
UD1010 # 10 Y:2020 | 10 | 2020 | REDESIGN PROCESS | $3,722 | $43,500 | Implemented |
UD1010 # 09 Y:2020 | 09 | 2020 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,565 | $0 | Not Implemented |
UD1010 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,704 | $10,753 | Not Implemented |
UD1010 # 07 Y:2020 | 07 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,616 | $7,457 | Not Implemented |
UD1010 # 06 Y:2020 | 06 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $483 | $5,500 | Implemented |
UD1010 # 05 Y:2020 | 05 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,001 | $60,000 | Implemented |
UD1010 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $21,830 | $20,000 | Not Implemented |
UD1010 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $7,123 | $5,000 | Not Implemented |
UD0839 # 06 Y:2011 | 06 | 2011 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $80,401 | $90,000 | Not Implemented |
UD0839 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,623 | $5,000 | Not Implemented |
UD0839 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,472 | $0 | Implemented |
UD0839 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $58,395 | $500 | Implemented |
UD0839 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $1,620 | $1,875 | Not Implemented |
UD0839 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,985 | $5,668 | Implemented |
UD0839 # 07 Y:2011 | 07 | 2011 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $29,882 | $59,764 | Not Implemented |
UD0839 # 08 Y:2011 | 08 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $80,401 | $90,000 | Not Implemented |
UD0839 # 12 Y:2011 | 12 | 2011 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,987 | $993 | Implemented |
UD0839 # 09 Y:2011 | 09 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,418 | $3,000 | Implemented |
UD0839 # 10 Y:2011 | 10 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $11,810 | $23,620 | Implemented |
UD0839 # 11 Y:2011 | 11 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $5,425 | $2,100 | Implemented |
UD0839 # 13 Y:2011 | 13 | 2011 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $48,911 | $75,000 | Implemented |
UD0839 # 14 Y:2011 | 14 | 2011 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $3,732 | $25 | Not Implemented |
WV0256 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $82 | $1,000 | Implemented |