Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
107
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0358 # 11 Y:2004 | 11 | 2004 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,223 | $100 | Implemented |
IA0358 # 02 Y:2004 | 02 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,969 | $18,000 | Implemented |
IA0358 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,528 | $359 | Implemented |
IA0358 # 05 Y:2004 | 05 | 2004 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $3,523 | $1,800 | Not Implemented |
IA0358 # 03 Y:2004 | 03 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,577 | $1,000 | Implemented |
IA0358 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,532 | $1,000 | Implemented |
IA0358 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $414 | $924 | Not Implemented |
IA0358 # 12 Y:2004 | 12 | 2004 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $3,166 | $40 | Implemented |
IA0358 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,052 | $609 | Not Implemented |
IA0358 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,955 | $3,368 | Implemented |
IA0358 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $930 | $2,030 | Not Implemented |
IA0358 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $633 | $633 | Implemented |
IA0355 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $2 | Implemented |
IA0355 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $3,116 | Not Implemented |
IA0355 # 09 Y:2004 | 09 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,817 | $1 | Not Implemented |
IA0355 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,227 | $3 | Not Implemented |
IA0355 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $956 | $230 | Implemented |
IA0355 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $540 | $359 | Implemented |
IA0355 # 05 Y:2004 | 05 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,161 | $3 | Implemented |
IA0355 # 04 Y:2004 | 04 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $8,646 | $2 | Implemented |
IA0355 # 03 Y:2004 | 03 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $12,422 | $17 | Implemented |
IA0355 # 02 Y:2004 | 02 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $965 | $25 | Not Implemented |
IA0355 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,113 | $300 | Implemented |
IA0355 # 12 Y:2004 | 12 | 2004 | INSTALL OCCUPANCY SENSORS | $334 | $616 | Not Implemented |
IA0355 # 13 Y:2004 | 13 | 2004 | ADD AREA LIGHTING SWITCHES | $1,045 | $689 | Not Implemented |