IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 31142 Fruit and Vegetable Canning, Pickling, and Drying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0057 # 08 Y:2010 08 2010 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $430,429 $460,000 Not Implemented
DL0057 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $39,401 $83 Not Implemented
DL0057 # 02 Y:2010 02 2010 CLOSE OFF UNNEEDED STEAM LINES $8,876 $415 Implemented
DL0057 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $143,083 $15,941 Implemented
DL0057 # 04 Y:2010 04 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $10,305 $2,960 Implemented
DL0057 # 10 Y:2010 10 2010 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $170,615 $510,000 Not Implemented
DL0057 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $88,954 $200,000 Not Implemented
DL0057 # 05 Y:2010 05 2010 REPAIR OR REPLACE STEAM TRAPS $413,326 $133,000 Implemented
DL0057 # 07 Y:2010 07 2010 REDUCE VENTILATION AIR $28,926 $30,000 Implemented
DL0057 # 06 Y:2010 06 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $38,896 $22,745 Not Implemented
MI0193 # 02 Y:2010 02 2010 HEAT WATER WITH EXHAUST HEAT $100,762 $23,000 Implemented
MI0193 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,162 $63,083 Implemented
MI0193 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,000 $1,210 Implemented
MI0193 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,004 $40 Implemented
MI0193 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $159,261 $64,000 Not Implemented
MI0193 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,565 $4,531 Not Implemented
MI0193 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,182 $1,750 Implemented
SU0295 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,574 $0 Implemented
SU0295 # 02 Y:2010 02 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,022 $0 Not Implemented
SU0295 # 03 Y:2010 03 2010 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $595,177 $272,656 Implemented
SU0295 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,178 $1,225 Implemented
SU0295 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,403 $27,649 Implemented
SU0295 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $1,649 Not Implemented
SU0295 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,943 $74,298 Implemented
SU0295 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $90 $724 Not Implemented