Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0839 # 07 Y:2011 | 07 | 2011 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $29,882 | $59,764 | Not Implemented |
UD0839 # 14 Y:2011 | 14 | 2011 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $3,732 | $25 | Not Implemented |
UD0839 # 13 Y:2011 | 13 | 2011 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $48,911 | $75,000 | Implemented |
UD0839 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,623 | $5,000 | Not Implemented |
UD0839 # 09 Y:2011 | 09 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,418 | $3,000 | Implemented |
UD0839 # 11 Y:2011 | 11 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $5,425 | $2,100 | Implemented |
UD0839 # 06 Y:2011 | 06 | 2011 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $80,401 | $90,000 | Not Implemented |
UD0839 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $1,620 | $1,875 | Not Implemented |
UD0839 # 08 Y:2011 | 08 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $80,401 | $90,000 | Not Implemented |
UD0839 # 10 Y:2011 | 10 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $11,810 | $23,620 | Implemented |
UD0839 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,985 | $5,668 | Implemented |
UD0839 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $58,395 | $500 | Implemented |
UD0839 # 12 Y:2011 | 12 | 2011 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,987 | $993 | Implemented |
UD0839 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,472 | $0 | Implemented |
MI0209 # 01 Y:2011 | 01 | 2011 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,297,734 | $3,000,000 | Implemented |
MI0209 # 09 Y:2011 | 09 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,681 | $50 | Implemented |
MI0209 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,599 | $1,320 | Implemented |
MI0209 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,204 | $29,679 | Implemented |
MI0209 # 06 Y:2011 | 06 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $107,940 | $330,568 | Implemented |
MI0209 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $112,996 | $1,950 | Implemented |
MI0209 # 04 Y:2011 | 04 | 2011 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $132,137 | $500,000 | Implemented |
MI0209 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $192,436 | $36,000 | Not Implemented |
MI0209 # 02 Y:2011 | 02 | 2011 | HEAT WATER WITH EXHAUST HEAT | $240,185 | $30,000 | Not Implemented |
MI0209 # 15 Y:2011 | 15 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,926 | $3,450 | Implemented |
MI0209 # 13 Y:2011 | 13 | 2011 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $7,944 | $2,000 | Not Implemented |