matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0513 # 05 Y:2017 | 05 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,342 | $27,695 | Implemented |
UF0513 # 07 Y:2017 | 07 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,443 | $1,481 | Implemented |
UF0513 # 02 Y:2017 | 02 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $25,893 | $3,150 | Implemented |
UF0513 # 08 Y:2017 | 08 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,095 | $5,053 | Implemented |
UF0513 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,848 | $10,386 | Not Implemented |
UF0513 # 01 Y:2017 | 01 | 2017 | REPLACE BOILER | $38,664 | $30,000 | Not Implemented |
UF0513 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,487 | $23,157 | Implemented |
UF0513 # 04 Y:2017 | 04 | 2017 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $7,542 | $0 | Implemented |
TR0002 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $187 | $55 | Implemented |
TR0002 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,895 | $10,000 | Not Implemented |
TR0002 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $500 | Implemented |
TR0002 # 01 Y:2017 | 01 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $30,725 | $22,000 | Implemented |
TR0002 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,329 | $60 | Implemented |
TR0002 # 06 Y:2017 | 06 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,204 | $0 | Implemented |
AM0733 # 02 Y:2017 | 02 | 2017 | METER WASTE WATER | $16,425 | $3,000 | Implemented |
AM0733 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,290 | $1,720 | Implemented |
AM0733 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $260 | $271 | Implemented |
AM0733 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,040 | $0 | Implemented |
AM0733 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,370 | $10 | Implemented |
AM0733 # 03 Y:2017 | 03 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,880 | $15,000 | Implemented |
AM0733 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,560 | $2,000 | Implemented |
LE0433 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,926 | $75,373 | Not Implemented |
LE0433 # 06 Y:2017 | 06 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $35,515 | $53,000 | Not Implemented |
LE0433 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,653 | $31,212 | Not Implemented |
LE0433 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,684 | $4,000 | Not Implemented |