Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0582 # 02 Y:2022 | 02 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $7,144 | $0 | Implemented |
SF0582 # 03 Y:2022 | 03 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $29,881 | $2,290 | Implemented |
SF0582 # 04 Y:2022 | 04 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $10,294 | $2,290 | Implemented |
SF0582 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,836 | $41,117 | Implemented |
SF0582 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,257 | $45,587 | Implemented |
SF0582 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,094 | $17,764 | Implemented |
SF0582 # 08 Y:2022 | 08 | 2022 | INSULATE BARE EQUIPMENT | $376 | $961 | Not Implemented |
SF0582 # 09 Y:2022 | 09 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,070 | $11,782 | Implemented |
SF0582 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,570 | $11,279 | Not Implemented |
SF0582 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,960 | $0 | Implemented |
SF0581 # 10 Y:2022 | 10 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,991 | $61,830 | Not Implemented |
SF0581 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,582 | $23,946 | Not Implemented |
SF0581 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $202 | $192 | Not Implemented |
SF0581 # 07 Y:2022 | 07 | 2022 | REPAIR AND ELIMINATE STEAM LEAKS | $2,960 | $2,345 | Not Implemented |
SF0581 # 06 Y:2022 | 06 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,550 | $1,334 | Not Implemented |
SF0581 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $7,711 | $3,227 | Not Implemented |
SF0581 # 04 Y:2022 | 04 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,523 | $1,537 | Not Implemented |
SF0581 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,255 | $300 | Not Implemented |
SF0581 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $488 | $0 | Not Implemented |
SF0581 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,942 | $0 | Not Implemented |