IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

624

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0175 # 04 Y:2004 04 2004 MINIMIZE WATER USAGE $1,683 $427 Implemented
SU0175 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,174 $6,679 Implemented
SU0175 # 06 Y:2004 06 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,764 $8,647 Implemented
SU0175 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $468 Implemented
SU0175 # 08 Y:2004 08 2004 INSTALL SOLID WASTE INCINERATOR FOR HEAT $9,162 $8,765 Not Implemented
BD0249 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $106,883 $3,200 Implemented
BD0249 # 02 Y:2003 02 2003 REPAIR AND ELIMINATE STEAM LEAKS $73,616 $4,000 Implemented
BD0249 # 03 Y:2003 03 2003 INSTALL TURBULATORS $20,715 $4,800 Not Implemented
BD0249 # 04 Y:2003 04 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $13,506 $250 Implemented
BD0249 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $11,077 $20,000 Implemented
BD0249 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $7,951 $6,000 Not Implemented
BD0249 # 07 Y:2003 07 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,325 $3,000 Not Implemented
BD0249 # 08 Y:2003 08 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,173 $12,250 Implemented
BD0249 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $3,218 $225 Implemented
BD0249 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $1,200 Implemented
BD0249 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,262 $6,120 Not Implemented
BD0249 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,672 $660 Not Implemented
BD0249 # 13 Y:2003 13 2003 INSTALL OCCUPANCY SENSORS $950 $1,200 Not Implemented
BD0249 # 14 Y:2003 14 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $885 $200 Not Implemented
BD0249 # 15 Y:2003 15 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $755 $0 Not Implemented
BD0249 # 16 Y:2003 16 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $575 $24 Not Implemented
BD0249 # 17 Y:2003 17 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $294 $335 Implemented
BD0249 # 18 Y:2003 18 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $274 $500 Not Implemented
BD0249 # 19 Y:2003 19 2003 TREAT AND REUSE RINSE WATERS $29,980 $10,000 Not Implemented
BD0249 # 20 Y:2003 20 2003 MINIMIZE WATER USAGE $11,992 $0 Implemented