IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented
BS0079 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,545 $6,216 Not Implemented
OR0584 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,152 $251,677 Not Implemented
OR0584 # 06 Y:2012 06 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,796 $19,701 Not Implemented
OR0584 # 05 Y:2012 05 2012 MINIMIZE WATER USAGE $4,574 $7,000 Not Implemented
OR0584 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,631 $27,000 Not Implemented
OR0584 # 03 Y:2012 03 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,839 $29,000 Not Implemented
OR0584 # 02 Y:2012 02 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $26,558 $19,925 Not Implemented
OR0584 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,320 $0 Not Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
OR0510 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,000 $11,600 Not Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented
OR0510 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $11,250 $13,600 Not Implemented
OR0510 # 05 Y:2006 05 2006 INSTALL SKYLIGHTS $4,750 $12,400 Not Implemented
OR0510 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,480 $5,000 Not Implemented
OR0510 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $19,200 Implemented
OR0491 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $650 $1,800 Not Implemented
OR0491 # 07 Y:2005 07 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,040 $10,650 Not Implemented
OR0491 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $2,440 $1,900 Not Implemented
OR0491 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $730 $1,300 Not Implemented
OR0491 # 04 Y:2005 04 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,180 $1,000 Not Implemented
OR0491 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,000 $7,200 Not Implemented
OR0491 # 02 Y:2005 02 2005 MODIFY MATERIAL APPLICATION METHODS $17,000 $7,200 Not Implemented
OR0491 # 01 Y:2005 01 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $22,340 $0 Not Implemented