Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 311421 | Fruit and Vegetable Canning |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0079 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $154 | $148 | Implemented |
BS0079 # 03 Y:2016 | 03 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $232 | $850 | Not Implemented |
BS0079 # 01 Y:2016 | 01 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,545 | $6,216 | Not Implemented |
OR0584 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,152 | $251,677 | Not Implemented |
OR0584 # 06 Y:2012 | 06 | 2012 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $7,796 | $19,701 | Not Implemented |
OR0584 # 05 Y:2012 | 05 | 2012 | MINIMIZE WATER USAGE | $4,574 | $7,000 | Not Implemented |
OR0584 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,631 | $27,000 | Not Implemented |
OR0584 # 03 Y:2012 | 03 | 2012 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $16,839 | $29,000 | Not Implemented |
OR0584 # 02 Y:2012 | 02 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $26,558 | $19,925 | Not Implemented |
OR0584 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,320 | $0 | Not Implemented |
OR0510 # 01 Y:2006 | 01 | 2006 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $61,000 | $40,000 | Implemented |
OR0510 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $15,000 | $11,600 | Not Implemented |
OR0510 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,200 | $35,000 | Implemented |
OR0510 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $11,250 | $13,600 | Not Implemented |
OR0510 # 05 Y:2006 | 05 | 2006 | INSTALL SKYLIGHTS | $4,750 | $12,400 | Not Implemented |
OR0510 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,480 | $5,000 | Not Implemented |
OR0510 # 07 Y:2006 | 07 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,900 | $19,200 | Implemented |
OR0491 # 08 Y:2005 | 08 | 2005 | OPTIMIZE PLANT POWER FACTOR | $650 | $1,800 | Not Implemented |
OR0491 # 07 Y:2005 | 07 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,040 | $10,650 | Not Implemented |
OR0491 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $2,440 | $1,900 | Not Implemented |
OR0491 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $730 | $1,300 | Not Implemented |
OR0491 # 04 Y:2005 | 04 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $1,180 | $1,000 | Not Implemented |
OR0491 # 03 Y:2005 | 03 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $14,000 | $7,200 | Not Implemented |
OR0491 # 02 Y:2005 | 02 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $17,000 | $7,200 | Not Implemented |
OR0491 # 01 Y:2005 | 01 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $22,340 | $0 | Not Implemented |