IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
NAICS 311423 Dried and Dehydrated Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0424 # 09 Y:2013 09 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,508 $26,000 Not Implemented
MI0227 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $63,004 $11,425 Implemented
MI0227 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,352 $21,342 Not Implemented
MI0227 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,918 $1,660 Implemented
MI0227 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,932 $19,454 Implemented
MI0227 # 05 Y:2012 05 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,886 $142,619 Implemented
MI0227 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,306 $12,160 Implemented
MI0227 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,036 $13,230 Not Implemented
MI0227 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,569 $8,859 Not Implemented
MI0227 # 09 Y:2012 09 2012 HEAT WATER WITH EXHAUST HEAT $6,137 $8,859 Not Implemented
MI0227 # 10 Y:2012 10 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,975 $3,480 Not Implemented
MI0227 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $3,170 $3,500 Not Implemented
SF0413 # 01 Y:2012 01 2012 COMBINE UTILITY METERS $27,096 $10,000 Not Implemented
SF0413 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $380 Implemented
SF0413 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,032 $1,872 Not Implemented
SF0413 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $380 $2,139 Not Implemented
SF0413 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $256 $684 Not Implemented
SF0413 # 06 Y:2012 06 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $40,499 $409,247 Implemented
SU0303 # 01 Y:2011 01 2011 INSULATE FEEDWATER TANK $273 $83 Implemented
SU0303 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $858 $486 Implemented
SU0303 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $128 Implemented
SU0303 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,814 $10,990 Not Implemented
SU0303 # 05 Y:2011 05 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $103 $275 Not Implemented
SU0303 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,973 $9,016 Not Implemented
SU0303 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,074 $16,668 Not Implemented