IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 311423 Dried and Dehydrated Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0543 # 11 Y:2008 11 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $52,540 $2,200 Implemented
OR0543 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,700 $46,700 Implemented
OR0543 # 13 Y:2008 13 2008 UPGRADE CONTROLS ON COMPRESSORS $7,300 $5,700 Implemented
UF0400 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,632 $9,727 Implemented
UF0400 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,731 $0 Not Implemented
UF0400 # 03 Y:2007 03 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,930 $624 Implemented
UF0400 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $4,182 $928 Implemented
UF0400 # 05 Y:2007 05 2007 KEEP EQUIPMENT CLEAN $3,059 $87 Implemented
UF0400 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,583 $21,927 Not Implemented
UF0400 # 07 Y:2007 07 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $653 $511 Not Implemented
UF0400 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $111,825 $230 Not Implemented
OR0508 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $69,500 $30,000 Implemented
OR0508 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,000 $2,000 Implemented
OR0508 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $24,700 $5,000 Implemented
OR0508 # 04 Y:2006 04 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $375,000 $480,000 Not Implemented
OR0508 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $18,300 $31,500 Not Implemented
OR0508 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $3,200 Implemented
OR0508 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,100 $12,000 Implemented
OR0508 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $5,100 $30,000 Implemented
OR0508 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $6,900 Not Implemented
SF0314 # 01 Y:2005 01 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,353 $0 Implemented
SF0314 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $6,788 $0 Implemented
SF0314 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $258 $0 Implemented
SF0314 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,926 $807 Not Implemented
SF0314 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,186 $14,112 Not Implemented