Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,447
matching recommendationsNAICS | 3115 | Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0042 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $99,111 | $675,274 | n/a |
CI0042 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,862 | $6,000 | n/a |
CI0042 # 09 Y:2024 | 09 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,050 | $6,000 | n/a |
CI0042 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,424 | $4,950 | n/a |
CI0042 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,797 | $90,000 | n/a |
CI0042 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $44,001 | $25,000 | n/a |
CI0042 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,561 | $4,560 | n/a |
CI0042 # 02 Y:2024 | 02 | 2024 | REPLACE BOILER | $66,255 | $50,000 | n/a |
CI0042 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,610 | $14,000 | n/a |
CI0042 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $8,210 | $2,325 | n/a |
WM0234 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,502 | $10,895 | n/a |
WM0234 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,418 | $0 | n/a |
WM0234 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,369 | $5,616 | n/a |
WM0234 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $5,023 | $279 | n/a |
WM0234 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,917 | $2,750 | n/a |
WM0234 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,221 | $0 | n/a |
WM0231 # 01 Y:2025 | 01 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $5,826 | $3,840 | n/a |
WM0231 # 05 Y:2025 | 05 | 2025 | REPLACE BOILER | $1,068 | $1,150 | n/a |
WM0231 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,383 | $1,500 | n/a |
WM0231 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,105 | $0 | n/a |
WM0231 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,829 | $10,000 | n/a |
WM0231 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $952 | $900 | n/a |
WM0228 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,531 | $4,430 | n/a |
WM0228 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,292 | $1,200 | n/a |
WM0228 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,628 | $3,197 | n/a |