IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,413

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0606 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,666 $923,010 Not Implemented
SF0606 # 06 Y:2023 06 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,028 $31,579 Not Implemented
SF0606 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,502 $8,173 Implemented
SF0606 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $5,279 $5,910 Implemented
SF0606 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,107 $564 Implemented
SF0606 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $5,475 $60 Implemented
SF0606 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,495 $1,440 Implemented
WM0203 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,100 $0 Implemented
WM0203 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,171 $17,500 Not Implemented
WM0203 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,070 $1,900 Not Implemented
WM0203 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,320 $13,750 Implemented
WM0203 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,369 $10,160 Implemented
WM0203 # 01 Y:2023 01 2023 USE SYNTHETIC LUBRICANT $16,641 $45,000 Implemented
UU0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $277 $142 Implemented
UU0223 # 04 Y:2023 04 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $3,305 $11,743 Implemented
UU0223 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,766 $26,767 Implemented
UU0223 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,735 $51,600 Implemented
UU0223 # 01 Y:2023 01 2023 ELIMINATE SHIFT $171,281 $5,500 Implemented
SF0601 # 07 Y:2023 07 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $12,826 $62,630 Not Implemented
SF0601 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,700 $12,525 Implemented
SF0601 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,103 $2,861 Not Implemented
SF0601 # 04 Y:2023 04 2023 USE OPTIMUM THICKNESS INSULATION $3,765 $1,482 Implemented
SF0601 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $80 Not Implemented
SF0601 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $1,168 $200 Not Implemented
SF0601 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $35,057 $0 Implemented