IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0601 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $295 $504 Implemented
SD0601 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $225 Implemented
SD0601 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $714 $1,555 Implemented
SD0592 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,440 $12,400 Implemented
SD0592 # 01 Y:2020 01 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $61,433 $149,300 Implemented
SD0592 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,470 $13,092 Implemented
SD0592 # 05 Y:2020 05 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,751 $5,661 Implemented
SF0520 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,938 $24,858 Implemented
SF0520 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,296 $8,179 Implemented
SF0520 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,563 $136 Implemented
SF0520 # 04 Y:2018 04 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $4,469 $4,039 Implemented
SF0520 # 02 Y:2018 02 2018 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,652 $800 Implemented
SF0520 # 09 Y:2018 09 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,289 $953 Implemented
SF0520 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $942 $900 Implemented
SF0519 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $9,168 $23,469 Implemented
SF0516 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,509 $36,186 Implemented
SF0516 # 11 Y:2018 11 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,207 $7,506 Implemented
SF0516 # 08 Y:2018 08 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,367 $15,956 Implemented
SF0516 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $32,827 $20,000 Implemented
SF0516 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $468 Implemented
SF0516 # 05 Y:2018 05 2018 REPAIR AND ELIMINATE STEAM LEAKS $488 $200 Implemented
SF0516 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $875 $200 Implemented
SF0516 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,647 $300 Implemented
SF0516 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,768 $350 Implemented
SF0492 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,543 $7,437 Implemented