Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsNAICS | 3115 | Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0404 # 10 Y:2011 | 10 | 2011 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $676 | $1,569 | Implemented |
SF0404 # 03 Y:2011 | 03 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $257 | $22 | Implemented |
SF0404 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,243 | $0 | Implemented |
SF0404 # 01 Y:2011 | 01 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $2,708 | $0 | Not Implemented |
SF0404 # 04 Y:2011 | 04 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $17,934 | $5,426 | Implemented |
SF0404 # 09 Y:2011 | 09 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $483 | $901 | Not Implemented |
SF0404 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $697 | $1,356 | Implemented |
SF0404 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,681 | $5,213 | Not Implemented |
SF0404 # 06 Y:2011 | 06 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,688 | $12,500 | Not Implemented |
SF0404 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,812 | $2,778 | Not Implemented |
SF0404 # 12 Y:2011 | 12 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,982 | $20,358 | Not Implemented |
SF0404 # 11 Y:2011 | 11 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,910 | $55,222 | Not Implemented |
LL0356 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,939 | $5,460 | Not Implemented |
LL0356 # 02 Y:2011 | 02 | 2011 | INSULATE BARE EQUIPMENT | $9,420 | $840 | Implemented |
LL0356 # 03 Y:2011 | 03 | 2011 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,884 | $30,300 | Not Implemented |
LL0356 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,032 | $30 | Not Implemented |
LL0356 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $6,412 | $1,127 | Implemented |
LL0356 # 06 Y:2011 | 06 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $5,817 | $1,291 | Not Implemented |
LL0356 # 01 Y:2011 | 01 | 2011 | INCREASE AMOUNT OF CONDENSATE RETURNED | $35,965 | $89,664 | Implemented |
LL0356 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $717 | $455 | Not Implemented |
LL0356 # 08 Y:2011 | 08 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,666 | $360 | Implemented |
LL0356 # 10 Y:2011 | 10 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $261 | $375 | Not Implemented |
LL0356 # 11 Y:2011 | 11 | 2011 | INSTALL OCCUPANCY SENSORS | $256 | $480 | Not Implemented |
LL0356 # 12 Y:2011 | 12 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $158 | $65 | Not Implemented |
LL0356 # 13 Y:2011 | 13 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $80 | $66 | Implemented |