Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
720
matching recommendationsNAICS | 3115 | Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0643 # 01 Y:2013 | 01 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $34,060 | $250,000 | Implemented |
AM0643 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,940 | $235 | Implemented |
AM0643 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,960 | $500 | Implemented |
AM0643 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,370 | $50 | Implemented |
AM0643 # 08 Y:2013 | 08 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $307 | $157 | Not Implemented |
AM0643 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,900 | $500 | Implemented |
AM0643 # 07 Y:2013 | 07 | 2013 | USE SYNTHETIC LUBRICANT | $1,887 | $0 | Not Implemented |
AM0643 # 09 Y:2013 | 09 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $250 | $126 | Not Implemented |
AM0643 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $2,700 | $1,800 | Not Implemented |
MZ0112 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $6,417 | $3,000 | Implemented |
MZ0112 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,415 | $0 | Implemented |
MZ0112 # 05 Y:2013 | 05 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $48,000 | $2,270 | Implemented |
MZ0112 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,737 | $0 | Not Implemented |
MZ0112 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,576 | $14,260 | Implemented |
MZ0112 # 09 Y:2013 | 09 | 2013 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $61,800 | $450,000 | Not Implemented |
MZ0112 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,329 | $0 | Not Implemented |
MZ0112 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,024 | $1,150 | Not Implemented |
MZ0112 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,303 | $1,160 | Not Implemented |
BS0009 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,037 | $126 | Implemented |
BS0009 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,533 | $2,806 | Not Implemented |
BS0009 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,077 | $689 | Implemented |
BS0009 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,591 | $260 | Implemented |
BS0009 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,495 | $1,840 | Not Implemented |
BS0009 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,187 | $1,066 | Not Implemented |
BS0009 # 06 Y:2013 | 06 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,422 | $3,959 | Implemented |