IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

527

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0289 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $770 $1,780 Implemented
BD0289 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $484 $0 Implemented
BD0289 # 09 Y:2005 09 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $315 $576 Implemented
BD0289 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $57,600 $105,000 Implemented
SU0209 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,769 $0 Implemented
SU0209 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,742 $509 Implemented
SU0209 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,683 $418 Implemented
SU0209 # 06 Y:2005 06 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $16,000 Implemented
SU0209 # 07 Y:2005 07 2005 USE SYNTHETIC LUBRICANT $1,072 $1,000 Implemented
OR0479 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $116,320 $115,000 Implemented
OR0479 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $19,750 $100 Implemented
OR0479 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,710 $800 Implemented
MI0099 # 01 Y:2005 01 2005 REPLACE BOILER $31,718 $82,200 Implemented
MI0099 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $11,973 $2,750 Implemented
MI0099 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,897 $470 Implemented
MI0099 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,355 $1,750 Implemented
MI0099 # 07 Y:2005 07 2005 USE MINIMUM STEAM OPERATING PRESSURE $200 $115 Implemented
AS0394 # 05 Y:2005 05 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $443,040 $453,047 Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
LL0207 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,769 $16,000 Implemented
LL0207 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $34,833 $7,488 Implemented
LL0207 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,149 $1,960 Implemented
LL0207 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,500 $3,150 Implemented
SU0197 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,966 $0 Implemented