Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0507 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,000 | $1,500 | Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,600 | $1,200 | Not Implemented |
OR0507 # 08 Y:2006 | 08 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $32,400 | $23,200 | Not Implemented |
OR0507 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $2,100 | $2,100 | Not Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 11 Y:2006 | 11 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,800 | $2,600 | Not Implemented |
OR0507 # 12 Y:2006 | 12 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $61,100 | $85 | Not Implemented |
OR0507 # 13 Y:2006 | 13 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,600 | $10,500 | Not Implemented |
OR0507 # 14 Y:2006 | 14 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,300 | $5 | Not Implemented |
OR0507 # 15 Y:2006 | 15 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,890 | $19,200 | Implemented |
OR0507 # 16 Y:2006 | 16 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,400 | $330,000 | Not Implemented |
OR0501 # 05 Y:2006 | 05 | 2006 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $25,000 | $3,400 | Not Implemented |
OR0501 # 04 Y:2006 | 04 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $31,700 | $105 | Implemented |
OR0501 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $8,560 | $100 | Implemented |
OR0501 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,100 | $0 | Implemented |
OR0501 # 03 Y:2006 | 03 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $41,300 | $59,700 | Implemented |
OR0501 # 02 Y:2006 | 02 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $72,600 | $1 | Implemented |
OR0501 # 01 Y:2006 | 01 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $119,000 | $200 | Implemented |
OR0479 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,710 | $800 | Implemented |
OR0479 # 04 Y:2005 | 04 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,500 | $0 | Not Implemented |
OR0479 # 05 Y:2005 | 05 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $700 | $0 | Not Implemented |
OR0479 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $116,320 | $115,000 | Implemented |
OR0479 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,750 | $100 | Implemented |
OR0442 # 04 Y:2003 | 04 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,900 | $0 | Implemented |