Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0562 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $721 | $1,740 | Implemented |
IA0562 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,171 | $2,324 | Not Implemented |
IA0562 # 05 Y:2016 | 05 | 2016 | DISCONNECT BALLASTS | $2,687 | $980 | Not Implemented |
IA0562 # 04 Y:2016 | 04 | 2016 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $4,205 | $2,457 | Implemented |
IA0562 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,873 | $750 | Implemented |
IA0562 # 02 Y:2016 | 02 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,222 | $7,477 | Implemented |
IA0562 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,778 | $52,400 | Implemented |
IA0459 # 05 Y:2010 | 05 | 2010 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,611 | $1,500 | Not Implemented |
IA0459 # 10 Y:2010 | 10 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,434 | $450 | Not Implemented |
IA0459 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,256 | $500 | Implemented |
IA0459 # 08 Y:2010 | 08 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,899 | $329 | Implemented |
IA0459 # 07 Y:2010 | 07 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $700 | $1,000 | Implemented |
IA0459 # 06 Y:2010 | 06 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,057 | $1,500 | Not Implemented |
IA0459 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,761 | $1,000 | Implemented |
IA0459 # 03 Y:2010 | 03 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $21,406 | $10,000 | Not Implemented |
IA0459 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $1,643 | $1,978 | Not Implemented |
IA0459 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,460 | $3,923 | Implemented |
IA0325 # 01 Y:2003 | 01 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,064 | $1,000 | Implemented |
IA0325 # 09 Y:2003 | 09 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $643 | $433 | Not Implemented |
IA0325 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $53 | $133 | Not Implemented |
IA0325 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,473 | $11,035 | Implemented |
IA0325 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $508 | $25 | Implemented |
IA0325 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $957 | $245 | Implemented |
IA0325 # 04 Y:2003 | 04 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,965 | $4,000 | Not Implemented |
IA0325 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $53,817 | $18,000 | Implemented |