IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0257 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $5,414 Not Implemented
MZ0257 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $2,925 Not Implemented
MZ0257 # 12 Y:2018 12 2018 MINIMIZE WATER USAGE $37,478 $0 Implemented
MZ0257 # 11 Y:2018 11 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,204 $0 Not Implemented
MZ0257 # 10 Y:2018 10 2018 USE COMPRESSOR AIR FILTERS $222 $200 Implemented
MZ0257 # 09 Y:2018 09 2018 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,294 $5,330 Implemented
MZ0257 # 08 Y:2018 08 2018 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $839 $1,900 Implemented
MZ0257 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $7,678 $7,480 Implemented
MZ0257 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $600 $752 Implemented
MZ0257 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,826 $0 Implemented
MZ0257 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,800 Implemented
MZ0257 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,472 $3,025 Not Implemented
BD0393 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $155 $300 Implemented
BD0393 # 02 Y:2011 02 2011 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,510 $10,000 Not Implemented
BD0393 # 01 Y:2011 01 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $54,406 $4,000 Not Implemented
BD0393 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $10 Implemented
BD0393 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,570 $9,600 Not Implemented
BD0393 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,084 $1,500 Not Implemented
BD0393 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,288 $107,000 Implemented
BD0289 # 10 Y:2005 10 2005 PAY BILLS ON TIME TO AVOID LATE FEES $1,052 $0 Not Implemented
BD0289 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $770 $1,780 Implemented
BD0289 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $910 $1,050 Implemented
BD0289 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $694 $900 Not Implemented
BD0289 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $57,600 $105,000 Implemented
BD0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,189 $3,500 Implemented