IAC Assessment: BD0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Cheese
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 157,800
Annual Production 9,000,000 Pounds
Production Hrs. Annual 6,264
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $309,932 5,037,224 kWh $0.06
Electricity Demand $57,304 9,430 kW-months/year $6.08
Electricity Fees $79,385 - $ -
Natural Gas $325,301 43,927 MMBtu $7.41
TOTAL ENERGY COSTS $771,922
RECOMMENDED SAVINGS* $87,214 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,644
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$54,406
Cost:
$4,000
- - - - $54,406 7,698 -
-
kWh
-
-
kW-months/year
$54,406
7,698
MMBtu
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$8,510
Cost:
$10,000
$(-171) (-2,773) - - $8,681 1,228 $(-171)
(-2,773)
kWh
-
-
kW-months/year
$8,681
1,228
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,288
Cost:
$107,000
$11,527 187,457 $2,761 454 - - $11,527
187,457
kWh
$2,761
454
kW-months/year
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,570
Cost:
$9,600
$5,286 85,954 $2,284 376 - - $5,286
85,954
kWh
$2,284
376
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,084
Cost:
$1,500
$1,752 28,482 $332 55 - - $1,752
28,482
kWh
$332
55
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$201
Cost:
$10
$169 2,745 $32 5 - - $169
2,745
kWh
$32
5
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$155
Cost:
$300
$104 1,696 $51 9 - - $104
1,696
kWh
$51
9
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$87,214
Cost:
$132,410
$18,667 303,561 $5,460 899 $63,087 8,926 $18,667
303,561
kWh
$5,460
899
kW-months/year
$63,087
8,926
MMBtu
TOTAL IMPLEMENTED Savings:
$14,644
Cost:
$107,310
$11,800 191,898 $2,844 468 - - $11,800
191,898
kWh
$2,844
468
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas