IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0356 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $9,420 $840 Implemented
LL0356 # 13 Y:2011 13 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $80 $66 Implemented
LL0356 # 12 Y:2011 12 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $158 $65 Not Implemented
LL0356 # 11 Y:2011 11 2011 INSTALL OCCUPANCY SENSORS $256 $480 Not Implemented
LL0356 # 10 Y:2011 10 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $261 $375 Not Implemented
LL0356 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $717 $455 Not Implemented
LL0356 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,666 $360 Implemented
LL0356 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $5,460 Not Implemented
LL0356 # 06 Y:2011 06 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,817 $1,291 Not Implemented
LL0356 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $6,412 $1,127 Implemented
LL0356 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,032 $30 Not Implemented
LL0356 # 03 Y:2011 03 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,884 $30,300 Not Implemented
LL0356 # 01 Y:2011 01 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $35,965 $89,664 Implemented
LL0207 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,769 $16,000 Implemented
LL0207 # 11 Y:2004 11 2004 RECOVER AND REUSE COOLING WATER $11,194 $32,000 Not Implemented
LL0207 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,500 $3,150 Implemented
LL0207 # 09 Y:2004 09 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $33 $180 Not Implemented
LL0207 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $99 $120 Not Implemented
LL0207 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $525 Not Implemented
LL0207 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $449 $30 Not Implemented
LL0207 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,149 $1,960 Implemented
LL0207 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,171 $225 Not Implemented
LL0207 # 03 Y:2004 03 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $6,837 $12,236 Not Implemented
LL0207 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $34,833 $7,488 Implemented