IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0404 # 10 Y:2011 10 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $676 $1,569 Implemented
SF0404 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $257 $22 Implemented
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0404 # 01 Y:2011 01 2011 OPERATE BOILERS ON HIGH FIRE SETTING $2,708 $0 Not Implemented
SF0404 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $17,934 $5,426 Implemented
SF0404 # 09 Y:2011 09 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $483 $901 Not Implemented
SF0404 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $697 $1,356 Implemented
SF0404 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $5,213 Not Implemented
SF0404 # 06 Y:2011 06 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,688 $12,500 Not Implemented
SF0404 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,812 $2,778 Not Implemented
SF0404 # 12 Y:2011 12 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,982 $20,358 Not Implemented
SF0404 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,910 $55,222 Not Implemented
LL0356 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $5,460 Not Implemented
LL0356 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $9,420 $840 Implemented
LL0356 # 03 Y:2011 03 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,884 $30,300 Not Implemented
LL0356 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,032 $30 Not Implemented
LL0356 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $6,412 $1,127 Implemented
LL0356 # 06 Y:2011 06 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,817 $1,291 Not Implemented
LL0356 # 01 Y:2011 01 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $35,965 $89,664 Implemented
LL0356 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $717 $455 Not Implemented
LL0356 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,666 $360 Implemented
LL0356 # 10 Y:2011 10 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $261 $375 Not Implemented
LL0356 # 11 Y:2011 11 2011 INSTALL OCCUPANCY SENSORS $256 $480 Not Implemented
LL0356 # 12 Y:2011 12 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $158 $65 Not Implemented
LL0356 # 13 Y:2011 13 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $80 $66 Implemented