Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
345
matching recommendationsNAICS | 311513 | Cheese Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0289 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,275 | $6,900 | Implemented |
BD0289 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,225 | $1,500 | Not Implemented |
BD0289 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $910 | $1,050 | Implemented |
BD0289 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $694 | $900 | Not Implemented |
BD0289 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $770 | $1,780 | Implemented |
BD0289 # 08 Y:2005 | 08 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $484 | $0 | Implemented |
BD0289 # 09 Y:2005 | 09 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $315 | $576 | Implemented |
BD0289 # 10 Y:2005 | 10 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,052 | $0 | Not Implemented |
BD0289 # 11 Y:2005 | 11 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $57,600 | $105,000 | Implemented |
AS0394 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,769 | $3,632 | Not Implemented |
AS0394 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $18,219 | $1,000 | Not Implemented |
AS0394 # 03 Y:2005 | 03 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,961 | $321 | Not Implemented |
AS0394 # 04 Y:2005 | 04 | 2005 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $71,792 | $33,000 | Not Implemented |
AS0394 # 05 Y:2005 | 05 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $443,040 | $453,047 | Implemented |
UU0081 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,948 | $2,000 | Not Implemented |
UU0081 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,684 | $6,171 | Not Implemented |
UU0081 # 03 Y:2005 | 03 | 2005 | INSTALL COMMON HEADER ON COMPRESSORS | $1,717 | $1,270 | Not Implemented |
UU0081 # 04 Y:2005 | 04 | 2005 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $2,724 | $11,700 | Not Implemented |
UU0081 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,000 | $500 | Not Implemented |
UU0081 # 06 Y:2005 | 06 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $996,810 | $10,000,000 | Not Implemented |
UU0081 # 07 Y:2005 | 07 | 2005 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $117 | $0 | Not Implemented |
UD0701 # 01 Y:2004 | 01 | 2004 | REDUCE OR ELIMINATE WASTE | $85,956 | $19,600 | Not Implemented |
UD0701 # 02 Y:2004 | 02 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $55,242 | $1,619 | Not Implemented |
UD0701 # 03 Y:2004 | 03 | 2004 | METER WASTE WATER | $51,851 | $15,700 | Not Implemented |
UD0701 # 04 Y:2004 | 04 | 2004 | REDUCE OR ELIMINATE WASTE | $38,220 | $620 | Not Implemented |