IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

345

matching recommendations
Reset
NAICS 311513 Cheese Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0519 # 09 Y:2018 09 2018 RECYCLE WHITE WATER $16,021 $7,759 Not Implemented
SF0519 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,974 $34,820 Not Implemented
SF0519 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,309 $55,280 Not Implemented
SF0519 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $9,168 $23,469 Implemented
SF0519 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,990 $19,331 Not Implemented
SF0519 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $376 $120 Not Implemented
SF0519 # 03 Y:2018 03 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,348 $20,000 Not Implemented
SF0519 # 04 Y:2018 04 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,597 $2,408 Not Implemented
WM0102 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $1,239 $863 Not Implemented
WM0102 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $2,034 $4,700 Not Implemented
WM0102 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,059 $5,282 Not Implemented
WM0102 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,200 $1,100 Not Implemented
WM0102 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $9,764 $1,490 Not Implemented
WM0102 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $23,950 $64,500 Not Implemented
WM0102 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $149,714 $205,925 Not Implemented
IA0566 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,976 $49,834 Implemented
IA0566 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,279 $6,724 Implemented
IA0566 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,889 $5,100 Implemented
IA0566 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $6,945 Implemented
IA0566 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,966 $195 Implemented
IA0566 # 06 Y:2016 06 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,284 $1,000 Implemented
IA0566 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $70 Implemented
WM0095 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,095 $735 Not Implemented
WM0095 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,696 $7,212 Implemented
WM0095 # 05 Y:2016 05 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,197 $0 Not Implemented