Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 311513 | Cheese Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0087 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,019 | $768 | n/a |
NL0087 # 04 Y:2023 | 04 | 2023 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,625 | $8,000 | n/a |
NL0087 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $254,315 | $454,461 | n/a |
NL0087 # 01 Y:2023 | 01 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $491,419 | $1,990,800 | n/a |
NL0087 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,789 | $100 | n/a |
NL0087 # 05 Y:2023 | 05 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,616 | $7,640 | n/a |
NL0087 # 03 Y:2023 | 03 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $17,666 | $50 | n/a |
NL0087 # 06 Y:2023 | 06 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $10,817 | $3,660 | n/a |
IA0451 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,659 | $140 | Implemented |
IA0451 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,102 | $1,000 | Implemented |
IA0451 # 01 Y:2010 | 01 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,327 | $1,729 | Implemented |
IA0451 # 04 Y:2010 | 04 | 2010 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $3,433 | $500 | Implemented |
IA0451 # 05 Y:2010 | 05 | 2010 | REDUCE VENTILATION AIR | $1,483 | $2,000 | Implemented |
IA0451 # 06 Y:2010 | 06 | 2010 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,080 | $240,000 | Not Implemented |
IA0398 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,700 | $39 | Implemented |
IA0398 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,226 | $21 | Not Implemented |
IA0398 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,272 | $1,333 | Not Implemented |
IA0398 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,710 | $1,000 | Implemented |
IA0398 # 05 Y:2006 | 05 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $12,539 | $900 | Not Implemented |
IA0398 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $9,808 | $6,000 | Implemented |
IA0398 # 07 Y:2006 | 07 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $7,646 | $1,000 | Implemented |
IA0398 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $861 | $555 | Implemented |
IA0398 # 09 Y:2006 | 09 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $255 | $340 | Implemented |
IA0398 # 10 Y:2006 | 10 | 2006 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $16,927 | $4,400 | Not Implemented |
IA0398 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $742 | $580 | Implemented |