Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 311513 | Cheese Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0995 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,887 | $17,856 | Implemented |
UD0995 # 08 Y:2019 | 08 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $606 | $0 | Implemented |
UD0995 # 07 Y:2019 | 07 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,847 | $11,694 | Implemented |
UD0995 # 06 Y:2019 | 06 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $35,713 | $75,000 | Not Implemented |
UD0995 # 05 Y:2019 | 05 | 2019 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $110,256 | $150,000 | Not Implemented |
UD0995 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,159 | $3,500 | Implemented |
UD0995 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $5,974 | $1,800 | Implemented |
UD0995 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,443 | $1,500 | Implemented |
UD0995 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $3,767 | $0 | Not Implemented |
UD0701 # 13 Y:2004 | 13 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $3,294 | Not Implemented |
UD0701 # 16 Y:2004 | 16 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $261 | $125 | Not Implemented |
UD0701 # 15 Y:2004 | 15 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $386 | $174 | Not Implemented |
UD0701 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $397 | $30 | Not Implemented |
UD0701 # 01 Y:2004 | 01 | 2004 | REDUCE OR ELIMINATE WASTE | $85,956 | $19,600 | Not Implemented |
UD0701 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,315 | $16,140 | Not Implemented |
UD0701 # 11 Y:2004 | 11 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $5,373 | $146 | Not Implemented |
UD0701 # 10 Y:2004 | 10 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,896 | $4,800 | Not Implemented |
UD0701 # 09 Y:2004 | 09 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,926 | $0 | Not Implemented |
UD0701 # 08 Y:2004 | 08 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,179 | $4,000 | Not Implemented |
UD0701 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,577 | $16,000 | Not Implemented |
UD0701 # 06 Y:2004 | 06 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,494 | $1,500 | Not Implemented |
UD0701 # 05 Y:2004 | 05 | 2004 | REDUCE VENTILATION AIR | $22,847 | $31,250 | Not Implemented |
UD0701 # 04 Y:2004 | 04 | 2004 | REDUCE OR ELIMINATE WASTE | $38,220 | $620 | Not Implemented |
UD0701 # 03 Y:2004 | 03 | 2004 | METER WASTE WATER | $51,851 | $15,700 | Not Implemented |
UD0701 # 02 Y:2004 | 02 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $55,242 | $1,619 | Not Implemented |