IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
Reset
NAICS 311514 Dry, Condensed, and Evaporated Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0621 # 10 Y:2024 10 2024 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $26,726 $23,394 n/a
SF0621 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $6,435 $478 n/a
SF0621 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,755 $300 n/a
SF0621 # 05 Y:2024 05 2024 INSTALL STEAM TRAP $9,822 $1,988 n/a
SF0621 # 06 Y:2024 06 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $335,892 $109,275 n/a
SF0621 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,248 $2,796 n/a
SF0621 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $17,564 $9,294 n/a
SF0621 # 07 Y:2024 07 2024 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,048 $1,839 n/a
SF0621 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $7,560 $700 n/a
SF0621 # 12 Y:2024 12 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $238,787 $1,065,639 n/a
SF0621 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,882 $0 n/a
SF0621 # 11 Y:2024 11 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,426 $15,810 n/a
SF0606 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,502 $8,173 Implemented
SF0606 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $5,475 $60 Implemented
SF0606 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,666 $923,010 Not Implemented
SF0606 # 06 Y:2023 06 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,028 $31,579 Not Implemented
SF0606 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $5,279 $5,910 Implemented
SF0606 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,107 $564 Implemented
SF0606 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,495 $1,440 Implemented
UW2205 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,984 $15,999 Implemented
UW2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,244 $12,938 Implemented
UW2205 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $169 $838 Not Implemented
AM0818 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $340 $550 Implemented
AM0818 # 06 Y:2020 06 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,910 $4,570 Not Implemented
AM0818 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $3,170 $524 Implemented