Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 311514 | Dry, Condensed, and Evaporated Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0709 # 07 Y:2018 | 07 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $1,651 | $7,363 | Not Implemented |
OR0709 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,210 | $0 | Not Implemented |
OR0709 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,418 | $45,772 | Not Implemented |
OR0709 # 04 Y:2018 | 04 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,664 | $1,000 | Not Implemented |
OR0709 # 03 Y:2018 | 03 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,478 | $1,000 | Not Implemented |
OR0709 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,023 | $49,521 | Not Implemented |
OR0709 # 01 Y:2018 | 01 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $60,750 | $77,700 | Not Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 16 Y:2006 | 16 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,400 | $330,000 | Not Implemented |
OR0507 # 15 Y:2006 | 15 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,890 | $19,200 | Implemented |
OR0507 # 14 Y:2006 | 14 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,300 | $5 | Not Implemented |
OR0507 # 13 Y:2006 | 13 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,600 | $10,500 | Not Implemented |
OR0507 # 12 Y:2006 | 12 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $61,100 | $85 | Not Implemented |
OR0507 # 11 Y:2006 | 11 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,800 | $2,600 | Not Implemented |
OR0507 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $2,100 | $2,100 | Not Implemented |
OR0507 # 08 Y:2006 | 08 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $32,400 | $23,200 | Not Implemented |
OR0507 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,600 | $1,200 | Not Implemented |
OR0507 # 06 Y:2006 | 06 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $60,100 | $41,100 | Implemented |
OR0507 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,000 | $1,500 | Implemented |
OR0507 # 04 Y:2006 | 04 | 2006 | KEEP BOILER TUBES CLEAN | $13,700 | $4,000 | Implemented |
OR0507 # 03 Y:2006 | 03 | 2006 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $13,600 | $3,200 | Not Implemented |
OR0507 # 02 Y:2006 | 02 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $46,800 | $2,000 | Implemented |
OR0507 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,600 | $0 | Implemented |
OR0441 # 01 Y:2003 | 01 | 2003 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $65,260 | $70,100 | Implemented |
OR0441 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $10,080 | Implemented |